Monticello Nuclear Generating Plant
Monticello Nuclear Generating Plant | |
---|---|
Country | United States |
Location | Monticello, Wright County, Minnesota |
Coordinates | 45°20′1″N 93°50′57″W / 45.33361°N 93.84917°W |
Status | Operational |
Construction began | June 19, 1967 |
Commission date | June 30, 1971 |
Construction cost | $455.8 million (2007 USD)[1] |
Owner | Xcel Energy |
Operator | Northern States Power Company |
Nuclear power station | |
Reactor type | BWR |
Reactor supplier | General Electric |
Cooling towers | 2 × Mechanical Draft |
Cooling source | Mississippi River |
Thermal capacity | 1 × 2004 MWth |
Power generation | |
Units operational | 1 × 647 MW |
Make and model | BWR-3 (Mark 1) |
Nameplate capacity | 647 MW |
Capacity factor | 91.04% (2017) 80.80% (lifetime) |
Annual net output | 5022 GWh (2021) |
External links | |
Website | Monticello Nuclear Generating Station |
Commons | Related media on Commons |
The Monticello Nuclear Generating Plant is a nuclear power plant located in Monticello, Minnesota, along the Mississippi River. The site, which began operating in 1971, has a single nuclear reactor (boiling water reactor) of the General Electric BWR-3 design generating 671 MWe. The plant is owned by Xcel Energy and operated by Northern States Power, its regional subsidiary.[2]
The reactor was originally licensed until 2010; a renewal license issued in 2006 has allowed it to continue operating until September 8, 2030. In January 2023, Northern States Power Company applied for a license renewal of 20 years beyond 2030.
Regulatory history
[edit]Monticello Nuclear Generating Plant began operating in 1971, has a single boiling water reactor of the General Electric BWR-3 design generating 671 MWe. The nuclear reactor was originally licensed until 2010; a renewal license issued in 2006 allows it to continue operating until September 8, 2030.[3]
In January 2023, Northern States Power Company applied for a license renewal of 20 years beyond 2030.[4][5]
Geography, seismic risk and surrounding population
[edit]The Nuclear Regulatory Commission (NRC) defines two emergency planning zones around nuclear power plants: a plume exposure pathway zone with a radius of 10 miles (16 km), concerned primarily with exposure to, and inhalation of, airborne radioactive contamination, and an ingestion pathway zone of about 50 miles (80 km), concerned primarily with ingestion of food and liquid contaminated by radioactivity.[6] The NRC's estimate of the risk each year of an earthquake intense enough to cause core damage to the reactor at Monticello was 1 in 52,632, according to an NRC study published in August 2010.[7][8]
According to the 2010 U.S. Census, the population was 62,976 within 10 miles (16 km) of Monticello, an increase of 36.5 percent in a decade; and 2,977,934 within 50 miles (80 km), an increase of 8.6 percent. Cities within 50 miles include the Twin Cities of Minneapolis (38 miles to city center) and St. Paul (45 miles to city center).[9]
The Monticello section of the Mississippi River remains unfrozen during winter and attracts hundreds of trumpeter swans, largely due to warm water discharged by the nuclear plant.[10]
Incidents and updates
[edit]In November 1971, 50,000 gallons of "low-level" radioactive water was released into the Mississippi River by the facility in order to conduct repairs.[11]
8,500 gallons of cesium-137 contaminated water were released into the Mississippi River by the facility on December 20, 1971 in order to conduct maintenance, and a second amount totaling 5,000 gallons from the same batch was released on December 29, 1971.[12][13]
Roughly 1,300 gallons (4.9 cubic meters) of radioactive water which accidentally leaked from the plant into the Mississippi River in an incident on 5 May 1982, was determined to be "no threat" to the public.[14]
21st century
[edit]In January 2007 a 13-ton control box fell eight to twelve inches and caused an unexpected shutdown. This control box was located in the condenser room of the turbine building and contained valves which controlled steam pressure. Emergency response teams at the station deemed that the event was likely caused by inadequate welds at the time of installation and fatigue due to vibrations over the life of the plant.[citation needed]
Construction of the on-site independent spent fuel storage installation (ISFSI) pad began in June 2007. The target date for the completion of the pads was December 2007 with insertion of the first ten dry storage containers (holding spent fuel assemblies ) into horizontal storage modules (HSMs) in mid-2008. Initially, 12 HSMs will be placed on the storage pad. Each HSM—a thick, reinforced, pre-cast concrete structure about the size of a single car garage—has the capacity to hold 61 fuel bundles.[citation needed]
On September 11, 2008, a cable fault tripped the transformer which supplied power to the site. This resulted in a loss of off-site power and the plant automatically shut down.[15]
On September 18, 2008, an employee for a rental equipment company was electrocuted by one phase of the 115-kV power line outside of the plant due to a lack of situational awareness. The individual was raising a bucket lift without watching overhead and contacted one phase of the 115-kV line. The plant was offline at the time due to the forced outage described above.[16]
In February 2011, the site's plant officials determined that four control rod blades could be affected by a potentially substantial safety hazard. Vice President Tim O'Connor indicated that the blades would be replaced in March.[17][18]
In 2006, Xcel Energy proposed a series of upgrades to the plant in order to increase its output and extend its life for an additional 20 years. In December 2013, the Nuclear Regulatory Commission approved [19] the license amendment allowing the unit to increase output from 600 MWe to 671 MWe. However, final project implementation costs significantly outstripped initial estimates by more than $400 million. In 2015, the Minnesota Public Utilities Commission denied full cost recovery and determined that, while Xcel Energy could include the additional cost in customer rates, it could not earn a return on those costs. Xcel Energy would record a greater than $100 million loss in 1Q 2015 as a result and recouped $27 million less than expected from the project.[citation needed]
In March 2013, the plant was shut down for a routine refueling. During this time, workers replaced several original plant components. This increased the plant's electrical output from the original 600 MWe to 671 MWe. In early August, the plant was brought back online with the new equipment. Refueling outages as such increase the population of the plant's workforce by the thousands.[citation needed]
In November 2022, 400,000 gallons (more than 1500 cubic meters) of water contaminated with tritium leaked from a water pipe running between two buildings at the facility.[20] Only 25% of the released tritium was recovered as of March 16, 2023, with cleanup continuing.[21] Another leak of hundreds of gallons of tritium-laced water, originating from a short-term fix for the original leak, was discovered on March 22.[22] Xcel announced that the nuclear plant would be powered down on March 24, 2023, to cut out a leaking 50-year-old pipe to repair the ongoing leak. Xcel president Chris Clark said that "there is always a risk that it would spill over again and have more tritium enter the groundwater."[23][24][25][needs update]
In December 2023, Xcel Energy was fined $14,000 by the Minnesota Pollution Control Agency for not obtaining a permit before pumping contaminated groundwater into temporary holding tanks.[26]
Electricity production
[edit]Year | Jan | Feb | Mar | Apr | May | Jun | Jul | Aug | Sep | Oct | Nov | Dec | Annual (Total) |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|
2001 | 440,695 | 340,547 | -4,261 | 369,313 | 431,818 | 417,928 | 422,760 | 415,031 | 411,801 | 396,154 | 21,897 | 212,639 | 3,876,322 |
2002 | 349,057 | 396,128 | 438,866 | 423,484 | 438,208 | 409,953 | 421,673 | 423,789 | 416,914 | 434,384 | 424,937 | 438,164 | 5,015,557 |
2003 | 436,483 | 393,223 | 437,856 | 345,599 | 50,496 | 369,107 | 424,318 | 420,302 | 416,377 | 436,020 | 424,869 | 421,860 | 4,576,510 |
2004 | 433,230 | 408,757 | 440,422 | 424,219 | 423,616 | 350,104 | 420,318 | 425,000 | 412,488 | 436,433 | 423,677 | 436,618 | 5,034,882 |
2005 | 436,233 | 363,285 | 42,698 | 228,534 | 436,029 | 413,038 | 420,637 | 421,445 | 414,350 | 437,081 | 423,304 | 438,284 | 4,474,918 |
2006 | 437,266 | 393,609 | 437,954 | 421,222 | 433,091 | 407,403 | 411,732 | 419,876 | 414,853 | 437,102 | 423,707 | 434,736 | 5,072,551 |
2007 | 232,813 | 391,535 | 173,046 | 6,240 | 420,460 | 414,784 | 424,641 | 425,406 | 420,682 | 439,692 | 407,935 | 435,035 | 4,192,269 |
2008 | 440,240 | 411,395 | 439,697 | 425,502 | 436,396 | 415,071 | 422,351 | 421,789 | 170,136 | 436,652 | 423,091 | 435,696 | 4,878,016 |
2009 | 400,966 | 390,162 | 168,280 | -2,230 | 247,583 | 413,210 | 421,814 | 420,893 | 410,568 | 420,808 | 418,648 | 431,762 | 4,142,464 |
2010 | 433,518 | 390,894 | 432,633 | 414,429 | 423,908 | 402,835 | 413,871 | 398,564 | 389,641 | 402,295 | 163,540 | 428,985 | 4,695,113 |
2011 | 434,903 | 391,689 | 49,550 | -2,209 | 45,668 | 337,853 | 415,665 | 387,105 | 414,046 | 328,906 | 264,265 | 288,837 | 3,356,278 |
2012 | 434,444 | 404,751 | 431,898 | 418,218 | 426,910 | 404,834 | 410,886 | 307,057 | 367,237 | 431,231 | 420,039 | 432,869 | 4,890,374 |
2013 | 426,909 | 391,008 | 6,649 | -1,399 | -2,103 | -1,208 | 71,069 | 412,756 | 408,379 | 431,803 | 419,876 | 429,835 | 2,993,574 |
2014 | 234,943 | 314,811 | 447,228 | 417,881 | 424,344 | 405,108 | 416,025 | 415,937 | 326,596 | 137,408 | 338,787 | 444,898 | 4,323,966 |
2015 | 462,652 | 420,166 | 465,432 | 156,356 | 2,466 | 418,819 | 470,732 | 477,996 | 462,826 | 492,735 | 357,253 | 476,462 | 4,663,895 |
2016 | 491,040 | 458,648 | 488,124 | 475,660 | 486,354 | 457,486 | 473,065 | 475,297 | 361,809 | 459,478 | 478,102 | 492,695 | 5,597,758 |
2017 | 486,644 | 443,965 | 480,983 | 175,184 | 252,980 | 449,491 | 473,963 | 478,975 | 464,544 | 490,160 | 475,734 | 486,997 | 5,159,620 |
2018 | 490,435 | 443,250 | 489,058 | 472,836 | 481,527 | 456,816 | 469,899 | 461,713 | 462,405 | 490,370 | 410,489 | 489,226 | 5,618,024 |
2019 | 469,517 | 392,464 | 387,120 | 132,626 | 263,845 | 460,683 | 469,176 | 473,507 | 463,668 | 488,998 | 474,910 | 488,061 | 4,964,575 |
2020 | 489,487 | 456,926 | 483,706 | 468,628 | 473,907 | 444,350 | 445,849 | 465,947 | 457,069 | 445,779 | 474,407 | 487,259 | 5,593,314 |
2021 | 479,432 | 435,017 | 439,966 | 203,430 | 157,540 | 454,863 | 464,321 | 480,624 | 465,120 | 484,214 | 473,243 | 485,088 | 5,022,858 |
2022 | 389,831 | 440,998 | 484,256 | 472,089 | 452,801 | 458,182 | 468,783 | 470,786 | 459,056 | 485,719 | 472,727 | 490,045 | 5,545,273 |
2023 | 487,762 | 440,350 | 341,230 | 158,956 | 246,782 | 456,685 | 469,864 | 470,532 |
See also
[edit]References
[edit]- ^ "EIA - State Nuclear Profiles". www.eia.gov. Retrieved October 3, 2017.
- ^ "PRIS - Reactor Details". Archived from the original on October 5, 2013.
- ^ "NRC: Monticello Nuclear Generating Plant, Unit 1". United States Nuclear Regulatory Commission. Retrieved December 22, 2019.
- ^ Monticello Nuclear Generating Plant (January 2023). "Monticello Nuclear Generating Plant Unit 1 Subsequent License Renewal Application". NRC.
{{cite web}}
: Missing or empty|url=
(help) - ^ "NRC Makes Monticello Subsequent License Renewal Application Available for Public Inspection" (PDF). NRC. January 27, 2023. Retrieved March 4, 2024.
- ^ "NRC: Emergency Planning Zones". United States Nuclear Regulatory Commission. Retrieved December 22, 2019.
- ^ "What are the odds? US nuke plants ranked by quake risk". NBC News. March 16, 2011. Retrieved August 16, 2024.
- ^ "Archived copy" (PDF). Archived from the original (PDF) on May 25, 2017. Retrieved April 19, 2011.
{{cite web}}
: CS1 maint: archived copy as title (link) - ^ "Nuclear neighbors: Population rises near US reactors". NBC News. April 14, 2011. Retrieved August 16, 2024.
- ^ Marohn, Kirsti (October 18, 2019). "In Monticello, a city at the center of the nuclear energy debate". MPR News. Retrieved December 22, 2019.
- ^ "NSP to delay atom discharges". The Minneapolis Star. November 24, 1971. p. 23. Retrieved December 17, 2023.
- ^ "Radioactive discharge fits state standards". Star Tribune. December 21, 1971. p. 16. Retrieved December 17, 2023.
- ^ "A-water released by NSP". The Minneapolis Star. December 29, 1971. p. 29. Retrieved December 17, 2023.
- ^ "Reactor leak 'no threat'". The Montreal Gazette. May 5, 1982. Retrieved March 24, 2011.
- ^ [1] Archived October 24, 2008, at the Wayback Machine
- ^ [2] Archived October 24, 2008, at the Wayback Machine
- ^ "Possible fuel rod hazard at Xcel's Monticello nuclear plant". Star Tribune. February 16, 2011. Archived from the original on February 21, 2011. Retrieved March 24, 2011.
- ^ Gram, Dave (February 17, 2011). "Possible fuel rod hazard seen at some nuke plants". BusinessWeek. Archived from the original on October 26, 2012.
- ^ "NRC: Package ML13316C459 - Monticello Nuclear Generating Plant - Issuance of Amendment No. 176 to Renewed Facility Operating License Regarding Extended Power Uprate (TAC No. MD9990)".
- ^ Karnowski, Steve (March 17, 2023). "400,000 gallons of radioactive water leak from nuclear plant". WKRC. Associated Press. Retrieved March 18, 2023.
- ^ Henry, Allen (March 16, 2023). "Xcel Energy cleaning up radioactive leak at Monticello nuclear generating plant". CBS Minnesota.
- ^ "Radioactive water leaks at Minn. nuclear plant for 2nd time". AP News. March 24, 2023.
- ^ Ortiz, Erik (March 24, 2023). "A nuclear plant that leaked 400,000 gallons of radioactive water will be shut down after second incident". CNBC.
- ^ Ahmed, Trisha; Daly, Matthew (March 24, 2023). "Minnesota nuclear plant shuts down for leak; residents worry". AP News.
- ^ Marohn, Kirsti (July 20, 2023). "Leaked tritium may have reached Mississippi River". MPR News. Retrieved July 21, 2023.
- ^ "Xcel Energy fined $14,000 after leaks of radioactive tritium from its Monticello plant in Minnesota - CBS Minnesota". www.cbsnews.com. December 15, 2023. Retrieved January 9, 2024.
- ^ "Electricity Data Browser". www.eia.gov. Retrieved January 7, 2023.
footnote number 6: